It had to be done. Much deletion, much editing, not much rewriting. Call it, blog-maintenance. The left eye is much better. Follow-up tomorrow and then hopefully that's it for a long time. I want to cut back on the eye drops too. Nasty aftertaste.
The four dollar paint for the back master bath looks like a winner. I daubed some by the door jamb and on different spots on the walls. I'll boost the lighting a little or add more trim for contrast. First is the wallpaper removal and getting the fixtures out. No rush, got plenty of finished bathrooms.... If money permits, a new toilet. Those new American Standards really do flush better then even my old rebuilt Plebe. I guess the EPA did get something right.
Other things to do, need some wire to prop up the insulation in the crawl space, caulk along the rest of the mud sills, and start insulating above the fireplace since the chimney chase is as dry as a bone inside. The attic could probably stand more insulation as well.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment